top of page

Water Supply System:

Well #6 and #7

Location: Buckingham Township, PA

Project Engineer: Castle Valley Consultants

Authority Engineer: Castle Valley Consultants

Mike 100.jpg

Furlong

Mike 092.jpg

All site work, detention basins, paving, and fencing were also included in MGK's scope of work.

The project included the construction of two new supply wells, a 100,000 gallon above grade storage tank, control building, booster pumps, chemical feed systems, and SCADA systems.

Wells #6 and #7 were constructed to supply a new residential community as well as to increase water supply and pressure to existing homes within the Township

About

Project gallery

bottom of page