Water Supply System:
Well #6 and #7
Location: Buckingham Township, PA
Project Engineer: Castle Valley Consultants
Authority Engineer: Castle Valley Consultants
Furlong
All site work, detention basins, paving, and fencing were also included in MGK's scope of work.
The project included the construction of two new supply wells, a 100,000 gallon above grade storage tank, control building, booster pumps, chemical feed systems, and SCADA systems.
Wells #6 and #7 were constructed to supply a new residential community as well as to increase water supply and pressure to existing homes within the Township